The 2-Minute Rule for Cast in Situ Piles in Bangladesh
three. Soon after rig positioning, travel the casing into the ground. Push steel casing to a bare minimum a depth of 1 m down below the bottom level to consider lateral loads and actions at site. The metal casing also overcome challenges as a consequence of groundwater through piling.
In situatio